Uniwill Group Ltd.
Uniwill Group Ltd.
Ring Main Unit
  • Ring Main Unit
Ring Main Unit

Ring Main Unit

Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Product Description
Product Description

Products Description
Name: Outdoor SF6 Ring Main Unit

The core component of the SF6 Filled Ring Main Unit which we manufacture adopts UGFLN-12/630 series switchgear. this Unit has enjoyed a wild use and good reputation in many cities in China. And this product fully satisfy the requirements of the users about the automatic facility in distribution network with non-oil, collocation, non-repair, module, corrosion-resistant, stable and high-adaptable to the environment etc.
Incoming and outgoing cables could be freely operated by hand or electrical automatic following user’s need, the breaker circuit collocates corresponding intelligent controller and the other related equipment to achieve the function of control, measurement and protection. People can purchase the collocated control equipment by stages according to the different investment phase, so this product not only have the strong upgrade capacity, but also save the clients’ money.
Features:
1. Safe and reliable
The gas box with switchgear in it is made of stainless steel, all the switches, busbar and mechanical facilities are sealed in one gas box which is full of SF6 with 0.3 mega-pa, this pressure is indicated by a manometer in the front panel.
2. Protection
An explosion-proof valve is fitted in lower-part position of the gas box’s back. The gas is designed to discharge by the explosion-proof valve, in order to guarantee the safety of people, cables and the other equipments, use the huffing method to destroy the electrical arc to decrease the  abrasion of the switches. Once the Unit has been finished in our factory, there is no need to test it in the working field, only to insert cables in to make it work. Designed mechanical life is 30 years.
3. Varity connection method
SF6 load switch could be collocated with vacuum breaker freely, and up to 4-7 switches can be assembled.
4. Observing window
Through the observing window, the faultage of the huffing-arc load switch can be observed clearly, indeed the position of the switch, in order to guarantee the safety better.
By collocating the electrical control system, electrical motor control facility and the PT etc, it’s more easier to update the Unit’s function from manual operation to auto-operation by computer, achieve the automatic function of perfect SCADA and remote control etc.
5. Varity assemble
According to user’s requirements, this Unit not only could be collocated with EU cables, but also could be collocated with USA cables.

Send your message to this supplier

  • Ms. Linda Deng

  • Enter between 20 to 4,000 characters.

Product Categories