Shenzhen Yidashun Technology Co., Ltd.
Shenzhen Yidashun Technology Co., Ltd.
12V 10A Power supply for led light CCTV
  • 12V 10A Power supply for led light CCTV
  • 12V 10A Power supply for led light CCTV
  • 12V 10A Power supply for led light CCTV
  • 12V 10A Power supply for led light CCTV
  • 12V 10A Power supply for led light CCTV
12V 10A Power supply for led light CCTV
12V 10A Power supply for led light CCTV
12V 10A Power supply for led light CCTV
12V 10A Power supply for led light CCTV
12V 10A Power supply for led light CCTV

12V 10A Power supply for led light CCTV

  • USD4.5
    ≥10 Piece/Pieces
Payment Type:
L/C, T/T, Paypal, Money Gram, Western Union
Incoterm:
FOB, CFR, CIF, EXW
Min. Order:
10 Piece/Pieces
Min. Order:
10 Piece/Pieces
Delivery Time:
5 Days
Transportation:
Ocean, Air, express
Port:
Shenzhen, Shekou
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: China
Productivity: 1000000pcs per month
Supply Ability: 10000000pcs per month
Payment Type: L/C,T/T,Paypal,Money Gram,Western Union
Incoterm: FOB,CFR,CIF,EXW
Certificate: CE&ROHS
HS Code: 8504401300
Transportation: Ocean,Air,express
Port: Shenzhen,Shekou
Product Description
Product Description

12v 10a led power supply


Features: 

Good quality & high performance&Good Disipation
AC 110V / 220V to DC 12V
120w led power supply can be used in led light, led strip, led module and so on .



- Watts: 120
- Input Voltage: AC110V-220V 
- Output Voltage: DC 12V
- Output Current: 10A
- Frequency: 50/60Hz
- Shell Material: Metal case 
- Working Temperature:0~40 degrees celsius 
- Storage Temperature: -20~60 degrees celsius



Detail Image:

12v Power Supply 212v Power Supply 412v Power Supply 5

Application:

power supply


- Only indoor use, non-waterproof. 
- High quality material, durable and safety in use. 
- Great switching power supply for home appliances. 
- A new style Switching Power Supply which can keep the voltage stability.


Switching Power Supply


Manufacturer line:

Yds Factory Test


Yds Production Ability


Packing:

packing


1.We have long term cooperation express partners:DHL,Fedex,TNT,UPS,EMS...DHL/UPS/Fedex express
usually take 3-6 days to the destination.
2.Factory will arrange shipment immediately once full payment collected.

3.We can accept T/T, Western Union and Paypal for small order,the best way is direct payment,you can 

choose by yourself. If you want other payment terms, please let us know before you place an order.

4. 30% deposit should be made as deposit before mass production and pay off balance before shipment.


Company Information: 

Factory


2


Contact information: 

Name: Cherry Peng

 ♥Skype:yidashun826

 ♥Whatsapp&Wechat:0086 13760377604

 

 

 If you are interested in our product ,contact me freely.


Send your message to this supplier

  • Ms. Sandy

  • Enter between 20 to 4,000 characters.