
Customized Medical Plastic Molding Clamp Case
- Payment Type:
- T/T, Paypal, Western Union
- Incoterm:
- FOB, CIF
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Delivery Time:
- 30 Days
- Transportation:
- Ocean, Air
- Port:
- Shenzhen, Shoukou, Guangzhou
Your message must be between 20 to 2000 characters
Contact NowPayment Type: | T/T,Paypal,Western Union |
---|---|
Incoterm: | FOB,CIF |
Transportation: | Ocean,Air |
Port: | Shenzhen,Shoukou,Guangzhou |
Customized Medical Plastic Molding Clamp Case Polyurethane Injection Mold and molding
Part Name CLAMP CASE.Part Number P1708A01.Drawing Number 237873.Injection System Cold Runner.Mold Steel P20 HH.Part Color Black.Material PA6.No. of Cavities 4
Shrinkage 1.013.Imd Molding, Plastic Molding,Over Molding,Transparent Molding.Furniture Fittings Mold,Furniture Fittings Mold, Plastic Mould
Our Advantages:
1) We have been doing professional plastic part and plastic parting products for 12 years, equipped with 30 sets mold processing equipment, proffessional CAD, CAM, CAE technology and special testing equipment.
2) Rich experience for export standard mold.
3) Our die include: auto parts, household appliances, medical equipment, House application products, electronic and electrical appliances, handicrafts and engineering construction etc...
4) We can quote the RFQ within 8-24 hours.
5) Skilled mold design to avoid any modification.
6) Help to improve the part design to save the mold cost.
7) Strictly mold tooling process control to delievry on time.
8) Professional sales to avoid the communication mistake.
Discription for mold making:
We promise | All customer-centric, never for short-term profit, and sell long-term benefits |
We produce |
Mold, prototype, injection molding, die casting,product assembly, surface printing, spraying the surface integration |
Pls provide | 2D, 3D, samples, or the size of the multi-angle pictures |
Mould Time | 20-35 Days |
Product time | 7-15 Days |
Moud precision | +/-0.01mm |
Mould life | 50-100 million shots |
Producing Process |
Audit drawings - mold flow analysis - design validation - Custom Materials - mold processing - core processing - electrode machining - Runner system processing -
parts processing and procurement - machining acceptance - cavity surface treatment process - complex mode Die - The entire mold surface coating - Mounting plate - mold sample - sample test - sending samples |
Mould cavity | One cavity, multi-cavity or same different products be made together |
Mould material | P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 |
Runner system | Hot runner and cold runner |
Base material | P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 |
Finish | Pitting the word, mirror finish, matte surface, striae |
Standard | HASCO, DME or dependent upon |
Main thechnology | Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes, surface Finish, etc. |
Software | CAD,PRO-E,UG Design Time: 1-3 days (normal circumstances) |
Product material |
ABS,PP,PC,PA6,PA66,TPU,POM,PBT,PVC,HIPS,PMMA,TPE,PC/ABS, TPV, TPO,TPR,EVA,HDPE,LDPE,CPVC,PVDF,PPSU.PPS. |
Quality system | ISO9001:2008 |
Establish time | 20days |
Equipment | CNC,EDM,Cutting off Machine,plastic machinery,etc plastic part |
Products show:
About Us:
Package:
Related Keywords