
Chinese Factory Electronics blister tray packaging plastic
-
USD0.2500-999 Piece/Pieces
-
USD0.181000-2999 Piece/Pieces
-
USD0.153000-4999 Piece/Pieces
-
USD0.135000-9999 Piece/Pieces
-
USD0.1≥10000 Piece/Pieces
- Payment Type:
- L/C, T/T, Western Union
- Incoterm:
- FOB, CFR, CIF
- Min. Order:
- 500 Piece/Pieces
- Min. Order:
- 500 Piece/Pieces
- Delivery Time:
- 7 Days
- Transportation:
- Ocean, Land, Air
- Port:
- Shenzhen YanTian, ShenZhen SheKou, GuangZhou HuangPu
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | SHENZHEN, CHINA |
---|---|
Productivity: | 500,000,00 PCS/month |
Supply Ability: | 500,000,00 PCS |
Payment Type: | L/C,T/T,Western Union |
Incoterm: | FOB,CFR,CIF |
Certificate: | ISO |
Transportation: | Ocean,Land,Air |
Port: | Shenzhen YanTian,ShenZhen SheKou,GuangZhou HuangPu |
Chinese Factory Electronics blister tray packaging plastic
YL Printing mainly produce the Plastic Blister Tray,Chinese Factory Blister Tray,Electronics Blister Tray,
Molded Pulp Tray,Ps Blister Packaging Tray,Ps Flocking Blister Trays,Ps Electronics Blister Tray
Sample lead time: If copy or amend from existing blister samples, need about 2 ~ 4 days; if make from 3D design or the samples to be packed, need about 5~ 7 days;
3) Production molding time: 5~ 7 days to copy to copper or make CNC after sample approval;
4) Production capacity: 100000 piece or 2000Kg per week;
5) Pricing: depending on the size and material to be used;
6) we can also produce the Printed Poly Bags Custom Printed Poly Bags,Printing Polybag,Small Plastic Bags
Production Description:
Our blister products are widely used at the field of production tool, electronic appliance, health care, stationary, hardware, cosmetics, toys, gifts, and foods.
· Blister Sample & production molding cost: USD 80 ~ 200 (from plaster to copper, depending on whether normal trays or complex
clamshells) or US$ 300 ~ 500 (from CNC aluminum to copper), depending on the size and complex levels) or US$1000 ~ 1500
(from CNC aluminum, depending on the size and complex levels).
· Sample lead time: If copy or amend from existing blister samples, need about 2 ~ 4 days; if make from 3D design or the samples
to be packed, need about 5~ 7 days.
· Production molding time: 5~ 7 days to copy to copper or make CNC after sample approval.
· Production capacity: 100000 piece or 2000Kg per week.
· Pricing: depending on the size and material to be used.
· Delivery sea/air port: Shenzhen or Hong Kong.
· Capable for printing before or after thermoforming.
· The pictures shown are for reference only, we can fully customize according to your requirement.


Related Keywords