
Drain Box Injection Moulding
- Payment Type:
- T/T
- Incoterm:
- FOB
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Delivery Time:
- 49 Days
- Transportation:
- Ocean
- Port:
- Shenzhen
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 50K shots |
Supply Ability: | 30 sets per month |
Payment Type: | T/T |
Incoterm: | FOB |
Certificate: | ISO 9001:2008 |
HS Code: | 8480719090 |
Transportation: | Ocean |
Port: | Shenzhen |
3K Mold mass produces quality tools in its own workshop using the latest CAM and CNC technology. We specialise in the development of design-oriented controls and is a series supplier for renowned automotive component suppliers.
Based on the specific requirements of the customers/OEMs, the individual solutions developed by our experts ensure functional operation and the fulfilment of all visual and haptic requirements. The development of the mechanical design plays as important a role as the selection of materials and the coordination of the electronic elements.
By making prototypes, the design can be demonstrated and re-checked before the start of series production.
Project Information | ||
Product Description | Part Name | Drain Box Injection Moulding |
Part Material | ABS | |
Part Size(mm) | 218x193x100mm | |
Mould Description | Cavity Insert Material | H13 HRC 48-52 |
Core Insert Material | H13 HRC 48-52 | |
Slider Insert Material | H13 HRC 48-52 | |
Mould Cavities | 1x2 | |
Mold parts Standard | DME | |
Mold Size | 595x775x697mm | |
Mold weight | 1910KG | |
Lead time | 7 weeks | |
Mould Life Time (Shots) | 50,000 | |
Mould Type | Export to USA | |
Runner Description | Incoe hot nozzle | |
Injection Gate Type | 2 Hot nozzles | |
Ejection System | Ejector pin | |
Slide Qty. | 4 | |
Lifter Qty. | 2 | |
Surface finish | B2 | |
Injection moulding machine | 450T |
3K Mold is ISO-9001: 2008 certified. We use formal quality systems to manage the overall quality process and use precision measurement facilities by our well-trained team. All tooling and parts produced at our facility are constantly monitored by our Quality Assurance Department to meet your specifications.
Quality control Center
3K team committed to meet customer quality and delivery request. The main quality control process as following:
Incoming quality control (IQC)
In process quality control (IPQC)
Quality assurance (QA)
Quality management flow:
1. Mold base inspection
2. Steel inspection
3. Mold component inspection
4. Electrodes inspection
5. Mold checking before assembly
6. (FAI, CPK) First Article dimension report
7. Mold checking before delivery
Related Keywords