3K Mold Co., Limited
3K Mold Co., Limited
Wheel Cover Injection Mould
  • Wheel Cover Injection Mould
Wheel Cover Injection Mould

Wheel Cover Injection Mould

Payment Type:
T/T
Incoterm:
FOB
Min. Order:
1 Set/Sets
Min. Order:
1 Set/Sets
Delivery Time:
60 Days
Transportation:
Ocean
Port:
Shenzhen
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: China
Productivity: 1000K shots
Supply Ability: 30 sets per month
Payment Type: T/T
Incoterm: FOB
Certificate: ISO 9001:2008
HS Code: 8480719090
Transportation: Ocean
Port: Shenzhen
Product Description
Product Description

We are a professional moulds manufacturer in China.

We think you are interesting to our company when you indeed look for a nice mould supplier,as a moulding company focus on cost, quality and timing, that is also what we do for our customer, so I am happy to share our  project management with you.

1, Each project, we focus on design at the first stage, because [A start to do right will make things more smoothly in the future".
2, Inspection at the material reception stage.
3, QC checking critical dimension before passing to next tooling step.
4, Inspection electrode dimension before EDM.
5, Passing a MIN 3 hours continuous run before shipment.

Please try to contact us for your new projects, thanks in advance.


Project Information
 
Product Description Part Name Wheel Cover Injection Mould
Part Material PA66+16%CM
Part Size(mm) 418.5*418.5*51.6
Mould Description Cavity Insert Material 1.2344 HRC50-52
Core Insert Material 1.2344 HRC50-52
Slider Insert Material 1.2343 HRC48-52
Mould Cavities 1
Mold parts Standard Hasco
Mould Life Time (Shots) 1,000,000
Mould Type Export to Germany
Runner Description Hot runner
Injection Gate Type 1 point gate
Ejection System Ejector Pin
Slide Qty. 8
Lifter Qty. 0
Injection moulding machine 400T


3K Mold is ISO-9001: 2008 certified. We use formal quality systems to manage the overall quality process and use precision measurement facilities by our well-trained team. All tooling and parts produced at our facility are constantly monitored by our Quality Assurance Department to meet your specifications.


Quality control Center


3K team committed to meet customer quality and delivery request. The main quality control process as following:


Incoming quality control (IQC)


In process quality control (IPQC)


Quality assurance (QA)

Automotive Molded Parts


Quality management flow:


1. Mold base inspection


2. Steel inspection


3. Mold component inspection


4. Electrodes inspection


5. Mold checking before assembly


6. (FAI, CPK) First Article dimension report


7. Mold checking before delivery

Automotive Molded Products 


Send your message to this supplier

  • Ms. Angel Qin

  • Enter between 20 to 4,000 characters.