shenzhen maxsun lighgting Co,Ltd
shenzhen maxsun lighgting Co,Ltd
0.6M10W  LEDT8 tube light
  • 0.6M10W  LEDT8 tube light
  • 0.6M10W  LEDT8 tube light
  • 0.6M10W  LEDT8 tube light
  • 0.6M10W  LEDT8 tube light
0.6M10W  LEDT8 tube light
0.6M10W  LEDT8 tube light
0.6M10W  LEDT8 tube light
0.6M10W  LEDT8 tube light

0.6M10W LEDT8 tube light

Payment Type:
T/T, L/C, D/P, Western Union
Incoterm:
FOB
Min. Order:
50
Min. Order:
50
Delivery Time:
10 Days
Transportation:
Ocean, Air
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: China
Productivity: 50000pcs
Supply Ability: 500000
Payment Type: T/T,L/C,D/P,Western Union
Incoterm: FOB
Certificate: CE ROHS TUV FCC
Transportation: Ocean,Air
Product Description
Product Description

0.6M10W LEDT8 tube light


Specification:
Light source: LED
LED light source: LED lumen maximum SMD 3014
Input voltage: 85 to 265V
Lamp power: 10w
Lamp luminous flux: 1100lm
Lamp luminous efficiency: 120lm/W
CRI: >70/75Ra
Color temperature (CCT): warm/cool/pure white
Working temperature: -30 to 50°C
Working lifetime: 50,000 hours
Lamp body material: aluminum
IP rating: IP44
Certification: CE
RoHS Directive-compliant
Place of origin: Guangdong, China (Mainland)
CCT: 2700 to 7000K
Weight: 348 ±15g
Chip: Epistar
LED quantity: 108-piece SMD 3014 LED
Size: T5 x 600mm
Warranty: 3 yearsNo UV and flickering, quick start time, saves 60% power consumption compared to other fluorescent lights
With long lifespan
Replacement for traditional T8 fluorescent light
With low energy consumption
Ideal for all energy-saving applications
No buzzing ballast
No mercury or hazardous materials
Eco-friendly
Just remove the starter when replace fluorescent tube with inductance ballast
Electronic ballast must be removed when replace fluorescent tube with electronic ballastApplications: offices, buildings, factories, family, homes, gallery, clothing stores, boutiques, art exhibition, hotel, reading room, tea houses, coffee bar, bar, stage, museums and other indoor or commercial lightingPayment terms: T/T, 30% deposits before production and 70% balance to be paid before shipment
Production lead time: 5 to 7 days for sample order and 10 to 15 days for bulk order
Shipping port: Shenzhen, China Mainland


Send your message to this supplier

  • Ms. Anna

  • Enter between 20 to 4,000 characters.