
84w 1195*595mm CCT Dimmable LED Panel Light
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Product Description
Product Description
Basic Specification
4000k | white |
---|---|
Material | Aluminum, PMMA |
Voltage | 110-220V |
Light Source | Energy-saving Lamp |
Application | Airport, Bathroom, Bathroom Room, Bedroom, Car Park, Church, Cinema, Gallery, Garage, Hospital, Hotel, Kitchen, Meeting Room, Museum, Office, Restaurant, School, Shopping Mall, Sitting Room |
Detail Description
Advantage
1. Special design for Double sides lighting
2. Patented 180Deg rotating end cap design for the best lighting result
3. Aluminum PCB better heat dissipation than FR4
4. Just replace starter with Focuson LED Fuse for retrofit
5. Single end power anti electric shock ensures safety
6. Maximum efficacy and Minimum glare
7. High-tech optical design
8. Isolating driver inside
9. TUV/UL certification
Temperature Characteristics T-ambient 25℃
Temperature Humidity
Operating -20---+40℃ Operating 10%-80%
Storage 10%-80% Storage -40---+85℃
Electrical Characteristics
Input Voltage :AC100—277V 50/60HZ
PF:>=0.93
Power Efficiency :>=0.87
1. Special design for Double sides lighting
2. Patented 180Deg rotating end cap design for the best lighting result
3. Aluminum PCB better heat dissipation than FR4
4. Just replace starter with Focuson LED Fuse for retrofit
5. Single end power anti electric shock ensures safety
6. Maximum efficacy and Minimum glare
7. High-tech optical design
8. Isolating driver inside
9. TUV/UL certification
Temperature Characteristics T-ambient 25℃
Temperature Humidity
Operating -20---+40℃ Operating 10%-80%
Storage 10%-80% Storage -40---+85℃
Electrical Characteristics
Input Voltage :AC100—277V 50/60HZ
PF:>=0.93
Power Efficiency :>=0.87
Additional Information
Payment Terms | L/C, T/T, Credit Card, Western Union |
---|---|
Minimum Order | 5 |
Lead Time / Delivery Time | 20 Day(s) |
Sample Available | YES |
Delivery Details | \"1).Lead Time: Say 25 days after confirmation of the sales contract;2).Payment Terms :30% by T/T as deposit, balance will be paid before delivery.3).Port of shippment: Shenzhen China\" |
FOB Port | Guangzhou |
Loading Info | \"1).Lead Time: Say 25 days after confirmation of the sales contract;2).Payment Terms :30% by T/T as deposit, balance will be paid before delivery.3).Port of shippment: Shenzhen China\" |
Packing Info | Inner Carton 1300*620*40mm 1pc/CtnGross Weight7.145kgNet weight6.840KGOuter Carton 1320*640*88mm 2pcs/CtnGross Weight16.69kg |
Target Market(s) | Africa(except Middle East), Eastern Europe, Hong Kong/ Macao/ Taiwan, Japan & Korea, Latin America, Middle East, North America, Northern Europe, Oceania, Central & Southern Asia, Southeast Asia, Western & Southern Europe |
Related Keywords
Related Keywords